Establish what the former tenant occupied
Orlando’s use application asks for the prior activity in the space, the proposed business use and the area the tenant will occupy. [S1]
When a bank takes only part of a former office, the landlord may describe the entire floor while the architect is designing a smaller suite. We reconcile the lease outline with the floor plan and ask planning staff how they classify the proposed branch. A lobby with teller service, consultation rooms and an after-hours vestibule gives staff a clearer picture than the word “office” on a leasing brochure.
Separate permission to use the space from permission to rebuild it
The City’s use application covers a building in its existing condition and expressly excludes structural alterations. [S1]
For a complete conversion, we ask the architect to identify what the branch keeps and what it replaces. A new public entry, a different lobby configuration or a proposed vault can change the work the team must coordinate. We confirm the construction review path separately and identify which decisions the landlord must make before the bank can release its remodel drawings.
Test the new branch site against the public facilities review
Orlando identifies new construction and changes of use as triggers for its concurrency process, which evaluates public facilities and services. The City calls for a location map and site plan. [S2]
For a ground-up branch on an outparcel, the bank’s leased area may end before the shared driveway. We ask the engineer to distinguish the parcel boundary, the proposed entrance and access that depends on the shopping center owner. If a drive-up teller is part of the program, we take its proposed operation to planning staff for a site-specific answer before the bank commits to the lane layout.
Build the capacity decision into the construction schedule
Orlando distinguishes a verification letter from an encumbrance letter. An encumbrance holds capacity for a limited period tied to building permit issuance or a capacity reservation certificate. [S2]
We record which letter the team actually receives, the applicable expiration and the next decision the developer owns. If a landlord approval or design change shifts the construction release, the project manager can flag that conflict while there is still time to ask the City about available options.
Resolve site and building comments together
Suppose a reviewer questions how customers reach the lobby from the shared parking aisle. Moving a pedestrian crossing can also shift the proposed ATM approach or the entrance shown on the architectural sheets. We route the comment to the civil engineer and architect together, confirm the selected response with branch operations, check the revised drawings against each other and track the resubmittal. The contractor can see which entrance detail is settled before ordering the assembly.
How Commercial Permits helps your project
How can Commercial Permits help my ground-up project get to construction faster?
Commercial Permits puts a dedicated permit expert in charge of moving your project through review. Our experts work with cities every day: pursuing review priority and available expedited paths, negotiating comments, finding compliant alternatives and challenging avoidable fee assessments. We coordinate directly with your architect of record and engineers to keep answers, revisions and resubmittals moving. You have one team pushing the permitting work forward so you can focus on getting the project built.
How much time do I need to spend on permits if I work with Commercial Permits?
No day-to-day permit management. Give us your plans and connect us with your architect and engineers; Commercial Permits takes it from there. Our white-glove team handles submissions, city follow-up, comment coordination and resubmittals with your design team. We keep you updated and bring you the project decisions that need your input. You do not have to chase reviewers, manage the permit portal or relay comments between the city and your consultants.
Why hire a permitting firm if I can submit online myself?
Submission is step one. The work comes afterward: getting reviews moving, negotiating comments, finding a compliant path through objections and coordinating the responses that get the project to its next decision. A comment can involve the city, your architect and several engineers. Commercial Permits takes ownership of that follow-through, works through the issue with the right people and keeps the response moving. You get experienced judgment and someone accountable for the permit work from submission through closeout.
Put a permit expert to work on your project.
Already working through city comments? See how Commercial Permits handles review comments and resubmittals, and explore a fictional issue tracker, responsibility table and weekly report showing the work our team takes over.
Official sources
- S1 · www.orlando.gov — checked 2026-11-25
- S2 · www.orlando.gov — checked 2026-11-25
City service overview. Availability depends on the property, proposed use and project scope. The reviewing authorities determine requirements and approvals.
Related services for your project
- Orlando FBO and hangar new construction and building remodel permitting
- Orlando commercial building remodel and complete renovation permitting
- Orlando car wash facility new construction and complete remodel permitting
- Orlando conditional use review for commercial new construction and building remodels
- Orlando vehicle dealership new construction and complete remodel permitting
- Orlando drone delivery facility new construction and complete remodel permitting
- Explore this industry’s national services